Published 2006
| Version v1
Miscellaneous
Preventive maintenance optimization at the Gentilly 2 NGS: initial results and lessons learned
- 1. Nuclear Generating Station Gentilly-2, Becancour, Quebec (Canada)
Description
This paper presents a Preventive Maintenance Optimization Process developed at the Gentilly 2 Nuclear Power Plant, and summarizes preliminary results of its initial implementation. It is based on both Streamlined Reliability Centered Maintenance and AP-913 Equipment Reliability Process. Results achieved and lessons learned create a sound base for continuing activities on remained Systems, Structures and Components (SSC). (author)
Additional details
Publishing Information
- Publisher
- Canadian Nuclear Society
- Imprint Place
- Toronto, Ontario (Canada)
- ISBN
- 0-919784-83-6
- Imprint Title
- Seventh CNS international conference on CANDU maintenance
- Imprint Pagination
- 79.9 Megabytes
- Journal Page Range
- [13 p.]
Conference
- Title
- 7. CNS international conference on CANDU maintenance. Proceedings
- Dates
- 20-22 Nov 2005
- Place
- Toronto, Ontario (Canada)
INIS
- Country of Publication
- Canada
- Country of Input or Organization
- Canada
- INIS RN
- 39031137
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- GENTILLY REACTOR; MAINTENANCE; NUCLEAR POWER PLANTS; PROGRAM MANAGEMENT; REACTOR COMPONENTS
- Descriptors DEC
- CANDU TYPE REACTORS; HEAVY WATER MODERATED REACTORS; HWLWR TYPE REACTORS; MANAGEMENT; NATURAL URANIUM REACTORS; NUCLEAR FACILITIES; POWER PLANTS; POWER REACTORS; PRESSURE TUBE REACTORS; REACTORS; THERMAL POWER PLANTS; THERMAL REACTORS; WATER COOLED REACTORS
Optional Information
- Notes
- 18 refs., 3 tabs., 1 fig.