Description

High availability and redundancy were required for a 24/7 technical baseline at a nuclear production facility. Process engineering, operations, and maintenance all had to connect to the AIM workflow and data management system at the plant. 24-hour availability and 100 percent data integrity were requirements. AIM 2.3.1 satisfied these needs by running in a clustered environment, using shared RAID 5 data storage installed with Oracle Fail Safe on clustered WinNT 4.0 Servers. Order of installation was critical for successful operation. The system has been running in production for 12 months with minimal downtime, and zero loss of data

Availability note (English)

Available from PURL: https://www.osti.gov/servlets/purl/815594-cl5TeL/native/

Additional details

Publishing Information

Imprint Pagination
[vp.]
Report number
WSRC-MS--2002-00979

Conference

Title
International Process and Power 2003 Conference
Dates
24-26 Sep 2003
Place
Las Vegas, NV (United States)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
34076129
Subject category
S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS; S99: GENERAL AND MISCELLANEOUS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
AVAILABILITY; MAINTENANCE; NUCLEAR FACILITIES; OPERATION

Optional Information

Contract/Grant/Project number
AC09-96SR18500
Funding organization
US Department of Energy (United States)