Published December 2001 | Version v1
Report Open

Summary of NRR future licensing activities

Creators

Description

In response to a renewed interest in building nuclear power plants, the NRC has created organizations within its major program offices to prepare the NRC staff for new applications (early site permits [ESPs], design certifications, and combined licenses) and to manage special task groups and pro-application reviews of new reactor designs. Activities planned in FY2001 and FY2002 include: (1) evaluating the ability of the NRC staff to support future application reviews under 10 CFR Parts 50 and 52; (2) performing pre-application reviews of the API 000 (a light-water reactor design with passive safety systems), Pebble Bed Modular Reactor (PBMR - a high-temperature gas-cooled reactor design), ESPs, IRIS (an advanced light-water reactor design), and GT-MHR (a high-temperature gas-cooled reactor design); (3) initiating and/or performing related rulemakings that will update 10 CPR Part 52 to reflect lessons learned from certifying three nuclear plant designs, update Tables S-3 and S-4 of 10 CFR Part 51 to address higher burnup fuel considerations and non-LWR advanced designs, and address alternative siting considerations; (4) reactivating the construction inspection program; and, (5) interacting with stakeholders to ensure there is a clear understanding of upcoming activities related to future applications and to solicit stakeholder input. In FY2002 and FY200S, activities are expected to include: (1) managing the reviews of fine new applications resulting from the pre-application reviews (including one design certification, one combined license, and three ESP reviews); (2) managing two pre-application reviews (IRIS and QT-MHR); (3) updating regulatory and review guidance for new applications, i.e., Standard Review Plans (SRPs), Regulatory Guides, and referenced codes and standards, and identifying where enhancements are needed; (4) developing independent codes to analyze the safety of non-LWR designs, with supporting validation testing; and, (5) addressing regulatory infrastructure issues, including NEI's proposed New Plant Regulatory Framework initiative, and NRC regulations governing financial issues and operator staffing

Files

35050486.pdf

Files (184.8 kB)

Name Size Download all
md5:2baf4efd1aa254863e828a418a93cab2
184.8 kB Preview Download
Part of:
Proceedings of the advisory committee on reactor safeguards workshop on future reactors

Additional details

Publishing Information

Imprint Title
Proceedings of the advisory committee on reactor safeguards workshop on future reactors
Imprint Pagination
340 p.
Journal Page Range
p. 165-170
Report number
NUREG/CP--0175

Conference

Title
Advisory committee on reactor safeguards workshop on future reactors
Dates
4-5 Jun 2001
Place
Rockville, MD (United States)

Optional Information

Secondary number(s)
INIS-XA-N--007