Published February 1996 | Version v1
Journal article

Coupled bunch instability and the cavity structure of the SPring-8 storage ring

  • 1. SPring-8 JASRI-JAERI-RIKEN Project Team, Kamigori-cho, Ako-gun, Hyogo 678-12 (Japan)

Description

Coupled bunch instability is one of the current limiting factor of the storage ring in multi-bunch operation. This instability occurs when the higher order mode (HOM) frequency of the cavity happens to be near the multiple of the revolution frequency. In designing the SPring-8 rf acceleration system, special care is taken to reduce the effect. Cavity shape is optimized in reducing the HOM impedances, and the cures against coupled bunch instabilities are introduced and explained. copyright 1996 American Institute of Physics

Additional details

Publishing Information

Journal Title
AIP Conference Proceedings
Journal Volume
356
Journal Issue
1
Journal Page Range
p. 177-187.
ISSN
0094-243X
CODEN
APCPCS

Conference

Title
4. Tamura symposium on accelerator physics.
Dates
14-16 Nov 1994.
Place
Austin, TX (United States).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
27075242
Subject category
S43: PARTICLE ACCELERATORS; S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BEAM BUNCHING; CAVITY RESONATORS; ELECTRODYNAMICS; ELECTRON BEAMS; GEV RANGE 01-10; MILLI AMP BEAM CURRENTS; STABILITY; STORAGE RINGS
Descriptors DEC
BEAM CURRENTS; BEAM DYNAMICS; BEAMS; CURRENTS; DYNAMICS; ELECTRONIC EQUIPMENT; ENERGY RANGE; EQUIPMENT; GEV RANGE; LEPTON BEAMS; MECHANICS; PARTICLE BEAMS; RESONATORS

Optional Information

Secondary number(s)
CONF-9411120--.