PFP total process throughput calculation and basis of estimate; TOPICAL
Description
The PFP Process Throughput Calculation and Basis of Estimate document provides the calculated value and basis of estimate for process throughput associated with material stabilization operations conducted in 234-52 Building. The process throughput data provided reflects the best estimates of material processing rates consistent with experience at the Plutonium Finishing Plant (PFP) and other U.S. Department of Energy (DOE) sites. The rates shown reflect demonstrated capacity during ''full'' operation. They do not reflect impacts of building down time. Therefore, these throughput rates need to have a Total Operating Efficiency (TOE) factor applied
Availability note (English)
Available from OSTI as DE00782321; www.osti.gov/servlets/purl/782321-eJRc69/native/; www.osti.gov/servlets/purl/782321-cLXVKB/webviewable/Additional details
Identifiers
Publishing Information
- Imprint Pagination
- 10 p.
- Report number
- HNF--4085-REV0
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 33066636
- Subject category
- S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS;
- Resource subtype / Literary indicator
- Non-conventional Literature
- Descriptors DEI
- CALCULATION METHODS; CAPACITY; DECOMMISSIONING; EFFICIENCY; FUEL REPROCESSING PLANTS; PLUTONIUM; STABILIZATION
- Descriptors DEC
- ACTINIDES; ELEMENTS; METALS; NUCLEAR FACILITIES; TRANSURANIUM ELEMENTS
Optional Information
- Contract/Grant/Project number
- AC06-96RL13200
- Funding organization
- US DOE Office of Environmental Management (United States)