PFP total process throughput calculation and basis of estimate; TOPICAL

Description

The PFP Process Throughput Calculation and Basis of Estimate document provides the calculated value and basis of estimate for process throughput associated with material stabilization operations conducted in 234-52 Building. The process throughput data provided reflects the best estimates of material processing rates consistent with experience at the Plutonium Finishing Plant (PFP) and other U.S. Department of Energy (DOE) sites. The rates shown reflect demonstrated capacity during ''full'' operation. They do not reflect impacts of building down time. Therefore, these throughput rates need to have a Total Operating Efficiency (TOE) factor applied

Availability note (English)

Available from OSTI as DE00782321; www.osti.gov/servlets/purl/782321-eJRc69/native/; www.osti.gov/servlets/purl/782321-cLXVKB/webviewable/

Additional details

Publishing Information

Imprint Pagination
10 p.
Report number
HNF--4085-REV0

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
33066636
Subject category
S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
CALCULATION METHODS; CAPACITY; DECOMMISSIONING; EFFICIENCY; FUEL REPROCESSING PLANTS; PLUTONIUM; STABILIZATION
Descriptors DEC
ACTINIDES; ELEMENTS; METALS; NUCLEAR FACILITIES; TRANSURANIUM ELEMENTS

Optional Information

Contract/Grant/Project number
AC06-96RL13200
Funding organization
US DOE Office of Environmental Management (United States)