Published April 1997 | Version v1
Miscellaneous

Managing the higher risks of low-cost high-efficiency advanced power generation technologies

Creators

  • 1. J. Michael Pearson and Associates Co. Ltd., Terra Cotta, ON (Canada)

Description

Independent power producers operate large coal-fired installations and gas turbine combined-cycle (GTCC) facilities. Combined cycle units are complex and their reliability and availability is greatly influenced by mechanical, instrumentation and control weaknesses. It was suggested that these weaknesses could be avoided by tighter specifications and more rigorous functional testing before acceptance by the owner. For the present, the difficulties of developing reliable, lower installed cost/kw, more efficient GTCC designs, pressure for lower NOx emissions with 'dry' combustors continue to be the most difficult challenges for all GT manufacturers

Additional details

Publishing Information

Publisher
Canadian Electricity Association.
Imprint Place
Montreal, PQ (Canada)
Imprint Title
Transactions of the Electricity '97 conference : new opportunities ahead
Imprint Pagination
[3000 p.].
Journal Page Range
p. 1-7.

Conference

Title
new opportunities ahead.
Acronym
CEA Electricity '97 conference
Dates
20-24 Apr 1997.
Place
Vancouver (Canada).

INIS

Country of Publication
Canada
Country of Input or Organization
Canada
INIS RN
29000171
Subject category
S13: HYDRO ENERGY;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
AVAILABILITY; COMBINED-CYCLE POWER PLANTS; ELECTRIC POWER; GAS TURBINES; RELIABILITY
Descriptors DEC
EQUIPMENT; MACHINERY; POWER; POWER PLANTS; THERMAL POWER PLANTS; TURBINES; TURBOMACHINERY

Optional Information

Notes
Imprint:Volume 1 of 4.
Secondary number(s)
CONF-9704161--.