Published February 26, 1982 | Version v1
Report Open

Elmo Bumpy Torus proof of principle. Phase II. Title 1 report. Volume III. Magnet system. Preliminary design report

Description

During Title I, General Dynamics' principal role as a subcontractor to the McDonnell Douglas Astronautics Company (MDAC) is to assist in the further development of a low-cost superconducting magnet mirror coil system for the EBT-P program consistent with long life and dependable operation. The activity can best be defined as an extension of ORNL's previous development program with further joint ORNL/MDAC/GDC refining of the mirror coil components. MDAC/GDC participation for the entire program can be subdivided into four distinct elements as follows: (1) design, development, and fabrication of two dewar subassemblies to enclose the ORNL developed and fabricated cold mass assemblies; (2) design, development, and fabrication of a production prototype magnet system including conductor (procurement), cold mass components, dewar and x-ray shield. This prototype would form the basis for the production of 36 magnets for the torus and three spares. (3) design, development, and fabrication of an electrical/electronic system including quench protection, instrumentation and control, and power supply to power and protect the mirror coil system during its operation in the torus; (4) fabrication of the 39 production magnets

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A99/MF A01 as DE83002550.

Files

14747834.pdf

Files (21.4 MB)

Name Size Download all
md5:8967a4b7ef4ff77ca2a53e45efb7e26c
21.4 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
791 p.
Report number
ORNL/Sub--81-21099/1-03

INIS