Published 2011 | Version v1
Miscellaneous Open

Failed (leaking) spent fuel management and storage in the Paks NPP

Creators

  • 1. Paks NPP (Hungary)

Description

At the cycle 22, unit 4, Paks NPP the fissile contents raised irregularly in the water of the primary circuit. At the end of the cycle sipping tests were performed for the entire core to find out the leaking fuel assembly primarily responsible for this phenomenon. The identified leaking assembly temporarily was placed in the Spent Fuel Relaxing Pool. For measuring environmental impact of leaking assemblies an investigation program was developed and implemented. The assessment covered the following: effects of the leaking fuel on the water of relaxing pool and on the gaseous emissions in case open storage; in case when the leaking cassette is in a special hermetical storage case, how much gas is collected in the locked case and what is its composition; how to change the measured sipping test signal depending on relaxing time of leaking fuel cassettes. Based on the evaluation of the investigation program results the NPP modified the operational instructions for the treatment and storage of failed fuel assemblies. (author)

Files

43056270.pdf

Files (577.4 kB)

Name Size Download all
md5:45f39f37e8a9c33e1fd563f21c18c571
577.4 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
10 p.
Report number
INIS-BG--1411

Conference

Title
9. International conference on WWER fuel performance, modelling and experimental support
Dates
17-24 Sep 2011
Place
Helena Resort (Bulgaria)

Optional Information

Notes
8 figs., 3 refs.