Published February 2010 | Version v1
Miscellaneous Open

Hydroelectric potential of existing works in the Ardennes district - Preliminary study report, Feasibility study for the development of La Ferte-sur-Chiers, Feasibility study for the development of the Montherme site

Description

A first document reports the analysis of five existing non-hydroelectric works. The objective is to see whether it is possible to equip them with a hydroelectric installation. For each of them, the report proposes a description of the site, a pre-diagnosis, a discussion of the regulatory framework, a hydrological analysis, a production assessment, and comments about a possible site rehabilitation. The next documents report feasibility studies performed for two of these sites. Each report presents the site and the adopted methodology, hydrological data, an analysis of the available height of fall, an analysis of environmental constraints, studied scenarios, a calculation of the possible production, a description of works to be performed, and a financial analysis

Files

49034405.pdf

Files (6.5 MB)

Name Size Download all
md5:d45ab4c668484ef1dc1753efc57c050b
6.5 MB Preview Download

Additional details

Additional titles

Original title (French)
Potentiel hydroelectrique d'ouvrages existants dans les Ardennes - Rapport d'etude preliminaire, Etude de faisabilite de l'amenagement de la Ferte-sur-Chiers, Etude de faisabilite du site de Montherme

Publishing Information

Imprint Pagination
84 p.
Report number
INIS-FR--18-0582

Optional Information

Notes
51 refs.; Available from the INIS Liaison Officer for France, see the 'INIS contacts' section of the INIS website for current contact and E-mail addresses: http://www.iaea.org/inis/Contacts/
Secondary number(s)
Rapport--09F-140-RP01; Rapport--09F-140-RP02; Rapport--09F-140-RP03