Published December 1997 | Version v1
Report Restricted

ESP's Tank 42 washwater transfer to the 241-F/H tank farms

  • 1. Westinghouse Savannah River Company, Aiken, SC (United States)
  • 2. Westinghouse Savannah River College, Aiken, SC (United States)

Description

As a result of the separation of the High-Level Liquid Waste Department into three separate organizations (formerly there were two) (Concentration, Storage, and Transfer (CST), Waste Pre-Treatment (WPT) and Waste Disposition (WD)) process interface controls were required. One of these controls is implementing the Waste the waste between CST and WPT. At present, CST's Waste Acceptance Criteria is undergoing revision and WPT has not prepared the required Waste Compliance Plan (WCP). The Waste Pre-Treatment organization is making preparations for transferring spent washwater in Tank 42 to Tank 43 and/or Tank 22. The washwater transfer is expected to complete the washing steps for preparing ESP batch 1B sludge. This report is intended to perform the function of a Waste Compliance Plan for the proposed transfer. Previously, transfers between the Tank Farm and ITP/ESP were controlled by requirements outlined in the Tank Farm's Technical Standards and ITP/ESP's Process Requirements. Additionally, these controls are implemented primarily in operating procedure 241-FH-7TSQ and ITP Operations Manual SW16.1-SOP-WTS-1 which will be completed prior to performing the waste transfers

Availability note (English)

Available from INIS in electronic form; ALSO AVAILABLE FROM OSTI AS DE98051771; NTIS; US GOVT. PRINTING OFFICE DEP.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
29 p.
Report number
WSRC-TR--97-00394