Published 1987
| Version v1
Book
Status of Tristan
Creators
- 1. National Lab. for High Energy Physics, Oho-machi, Tsukuba-gun, Ibaraki-ken (Japan)
Description
After the five years construction period, the TRISTAN electron-positron beam collider was commissioned successfully in November 1986. With three detectors installed at three out of four beam collision areas in the ring, colliding beam experiments have begun in December 1986. The current status of the TRISTAN accelerator operation is presented along with a brief description on the accelerator sub-systems
Additional details
Publishing Information
- Publisher
- IEEE Service Center.
- Imprint Place
- Piscataway, NJ (USA)
- Imprint Title
- Proceedings of the 1987 IEEE particle accelerator conference: Accelerator engineering and technology
- Journal Page Range
- p. 34-38.
Conference
- Title
- Particle accelerator conference.
- Dates
- 16-19 Mar 1987.
- Place
- Washington, DC (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 19084308
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- COLLIDING BEAMS; ELECTRON-POSITRON COLLISIONS; OPERATION; TRISTAN STORAGE RINGS
- Descriptors DEC
- BEAMS; COLLISIONS; ELECTRON COLLISIONS; POSITRON COLLISIONS; STORAGE RINGS