Project W-320, operational test procedure OTP-320-003 test report

Description

This report documents and summarizes the results of OTP-320-003 Project W-320 Operational Testing of the WRSS Supernate Transfer System. Project W-320 Operational Test OTP-320-003 was performed to verify components of the Waste Retrieval Sluicing System (WRSS) supernate transfer system functioned as designed following construction completion and turnover to operations. All equipment operation was performed by Tank Farms Operations personnel following the operational test procedure and referenced operating procedures. Supernate Transfer line Flushing System Testing was completed over the course of approximately 4 weeks as tank farm conditions and configuration, equipment availability, and operations resources allowed. All testing was performed with the 702-AZ ventilation system and the 296-P-16 ventilation systems in operation. Test procedure OTP-320-003 required two revisions during testing to incorporate Procedure Changes Authorizations (PCAs) necessary to facilitate testing. Various sections of testing are documented on each procedure revision. The completed test procedure is included as Attachment A. Exception Reports generated during the course of testing are included as Attachment B

Availability note (English)

Available from INIS in electronic form; ALSO AVAILABLE FROM OSTI AS DE99050856; NTIS; INIS; US GOVT. PRINTING OFFICE DEP.

Files

30039957.pdf

Files (9.5 MB)

Name Size Download all
md5:0f0cab497be43d96288d208de1a6e639
9.5 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
259 p.
Report number
HNF--3057