Published 1997 | Version v1
Book

Beam-power damage of beam monitor components

  • 1. High Energy Accelerator Research Organization, Tsukuba, Ibaraki (Japan)

Description

Recently, the Accumulation Ring (AR) ran with high beam current of 500 mA for the KEKB. Some troubles in hardware components of a beam monitor system were found. The most serious trouble was that a deflector electrode of a transverse feedback system blocked off a beam after it was heated up and bended. Moreover, a coaxial cable connected to the electrode was shorted. A bench test suggests that these troubles were triggered by rf power from the beam. (author)

Part of:
Proceedings of the 11th symposium on accelerator science and technology

Additional details

Publishing Information

Publisher
Japan Synchrotron Radiation Research Inst., JASRI
Imprint Place
Kamigori, Hyogo (Japan)
Imprint Title
Proceedings of the 11th symposium on accelerator science and technology
Imprint Pagination
563 p.
Journal Page Range
p. 252-254

Conference

Title
11. symposium on accelerator science and technology
Dates
21-23 Oct 1997
Place
Kamigori, Hyogo (Japan)

Optional Information