Published November 15, 1994 | Version v1
Report Open

Heat exchanger bypass test procedure

Description

The HC-21C Muffle Furnace Process has been experiencing problems with corrosion of the off-gas piping system. During the processing cycle, condensation is forming and corroding the off-gas piping. The corrosion products build up in the rotameters and cause them to be dysfunctional. The condensation is suspected to be occurring in the heat exchanger, so the test will bypass the heat exchanger to verify this. This process test will help to establish a temperature profile for the off-gas system near the rotameter. Also, this information will be used to help determine the location and cause of water condensation that is occurring in the off-gas equipment. The process test will include operating one of the two furnaces in Room 230A to stabilize Pu bearing material. During the test run, various temperature readings will be taken and visual inspections done

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95004162; NTIS; US Govt. Printing Office Dep.

Files

26038172.pdf

Files (407.0 kB)

Name Size Download all
md5:827de22febfa0e455d254b6fe15017ab
407.0 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
7 p.
Report number
WHC-SD--CP-TC-031

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).