Published November 1985
| Version v1
Journal article
Fuel cycle cost reduction through Westinghouse fuel design and core management
Description
This paper describes advances in Westinghouse nuclear fuel and their impact on fuel cycle cost. Recent fabrication development has been aimed at maintaining high integrity, increased operating flexibility, longer operating cycles, and improved core margins. Development efforts at Westinghouse toward meeting these directions have culminated in VANTAGE 5 fuel. The current trend toward longer operating cycles provides a further driving force to minimize the resulting inherent increase in fuel cycle costs by further increases in region discharge burnup. Westinghouse studies indicate the capability of currently offered products to meet cycle lengths up to 24 months
Additional details
Publishing Information
- Journal Title
- Trans. Am. Nucl. Soc.
- Journal Volume
- 50
- Series
- Trans. Am. Nucl. Soc.
- Journal Page Range
- 101-102
- ISSN
- 0003-018X
- CODEN
- TANSA
Conference
- Title
- American Nuclear Society winter meeting.
- Dates
- 10-15 Nov 1985.
- Place
- San Francisco, CA (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 17083271
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- BURNUP; ECONOMICS; FABRICATION; FUEL ASSEMBLIES; FUEL CANS; FUEL MANAGEMENT; PLANNING; REACTOR CORES; WESTINGHOUSE STANDARD REACTOR; ZIRCALOY
- Descriptors DEC
- ALLOYS; ENRICHED URANIUM REACTORS; MANAGEMENT; NUCLEAR MATERIALS MANAGEMENT; POWER REACTORS; PWR TYPE REACTORS; REACTOR COMPONENTS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; ZIRCONIUM ALLOYS; ZIRCONIUM BASE ALLOYS
Optional Information
- Secondary number(s)
- CONF-851115--.