Published 2018 | Version v1
Miscellaneous

Status of new power supply for bending magnet in J-PARC Main Ring upgrade

  • 1. High Energy Accelerator Research Organization (KEK), Tsukuba, Ibaraki (Japan)
  • 2. Universal Engineering, Mito, Ibaraki (Japan)

Description

It plans that the proton beam power provided to experimental facilities increase with shortening repetition period in J-PARC MR. As the shorten repetition period, the replacement of the power converters for main magnets in J-PARC MR is necessary to cope with issues such as power fluction of the Main Grid and increase of the output voltage. We have considered and developed the power converter with a 10MW class which have the capacitor bank with large capacitance. In the end of 2017, the first new power converter for a bending magnets family is installed in J-PARC site and the power test is ongoing using a dummy load. In this report, the first new power converter for a bending magnets family in J-PARC MR is reported including the test result. (author)

Part of:
Proceedings of the 15th annual meeting of Particle Accelerator Society of Japan

Additional details

Additional titles

Original title (Japanese)
J-PARC主リング高繰り返し化のための偏向電磁石用新電源開発の状況

Publishing Information

Imprint Title
Proceedings of the 15th annual meeting of Particle Accelerator Society of Japan
Imprint Pagination
[1380 p.]
Journal Page Range
p. 992-995

Conference

Title
15. annual meeting of Particle Accelerator Society of Japan
Acronym
PASJ2018
Dates
7-10 Aug 2018
Place
Nagaoka, Niigata (Japan)

Optional Information

Notes
7 refs., 6 figs., 2 tabs.; This record replaces 50036880 Imprint:#7B2C#15#56DE##65E5##672C##52A0##901F##5668##5B66##4F1A##5E74##4F1A#