Published July 2003 | Version v1
Report Open

Assessment and management of ageing of major nuclear power plant components important to safety. Primary piping in PWRs

Description

At present, there are over four hundred operational nuclear power plants (NPPs) in IAEA Member States. Operating experience has shown that ineffective control of the ageing degradation of the major NPP components (caused for instance by unanticipated phenomena and by operating, maintenance or manufacturing errors) can jeopardize plant safety and also plant life. Ageing in these NPPs must therefore be effectively managed to ensure the availability of design functions throughout the plant service life. From the safety perspective, this means controlling, within acceptable limits, the ageing degradation and wear out of plant components important to safety so that adequate safety margins remain, i.e. integrity and functional capability in excess of normal operating requirements. This TECDOC is one in a series of reports on the assessment and management of ageing of the major NPP components important to safety. The reports are based on experience and practices of NPP operators, regulators, designers, manufacturers, technical support organizations and a widely accepted Methodology for the Management of Ageing of NPP Components Important to Safety, which was issued by the IAEA in 1992. Since the reports are written from a safety perspective, they do not address life or life cycle management of plant components, which involves economic considerations. The current practices for the assessment of safety margins (fitness-for-service) and the inspection, monitoring and mitigation of ageing degradation of selected components of Canada deuterium-uranium (CANDU) reactors, boiling water reactors (BWRs), pressurized water reactors (PWRs), and water moderated, water cooled energy reactors (WWERs) are documented in the reports. These practices are intended to help all involved directly and indirectly in ensuring the safe operation of NPPs, and to provide a common technical basis for dialogue between plant operators and regulators when dealing with age-related licensing issues. The guidance reports are directed at technical experts from NPPs and from regulatory, plant design, manufacturing and technical support organizations dealing with specific plant components addressed in the reports. This report addresses the primary piping in PWRs including main coolant piping, surge and spray lines, Class 1 piping in attached systems, and small diameter piping that cannot be isolated from the primary coolant system. Maintaining the structural integrity of this piping throughout NPP service life in spite of several ageing mechanisms is essential for plant safety

Availability note (English)

Available from INIS in electronic form; Also available on-line: http://www-pub.iaea.org/MTCD/publications/PDF/te_1361_web.pdf; For availability on CD-ROM, please contact IAEA, Sales and Promotion Unit: E-mail: sales.publications@iaea.org; Web site: http://www-pub.iaea.org/MTCD/publications/publications.asp

Files

34083105.pdf

Files (3.2 MB)

Name Size Download all
md5:a17130808aa9209ed9d1950ef197cc4d
3.2 MB Preview Download

Additional details

Publishing Information

ISBN
92-0-108003-4
Imprint Pagination
242 p.
ISSN
1011-4289
Report number
IAEA-TECDOC--1361

Optional Information

Notes
Refs, figs, tabs