Published 1992 | Version v1
Book

ESRF synchrotron injector beam position monitor system

  • 1. European Synchrotron Radiation Facility, 38 - Grenoble (France)

Description

The complete lay-out of the BPM system which comprises 75 individual stations is presented from electro-static button signals down to the user level of the computer interface. The design of the electrode button and the block geometry is presented. The timing and the data-acquisition electronics permit precisely timed measurements to be taken simultaneously on all 75 BPM stations at a rate of 1 KHz. The results of this BPM system, are summarised with the performance characteristics of resolution, precision and reproductibility. (author) 4 refs.; 4 figs

Part of:
Proceedings of the 3. European particle accelerator conference. V. 2

Additional details

Publishing Information

Publisher
Editions Frontieres.
Imprint Place
Paris (France)
ISBN
2-86332-115-3
Imprint Title
Proceedings of the 3. European particle accelerator conference. V. 2
Imprint Pagination
[941 p.].
Journal Page Range
p. 1121-1123.

Conference

Title
3. European particle accelerator conference.
Acronym
EPAC 92
Dates
24-28 Mar 1992.
Place
Berlin (Germany).

INIS

Country of Publication
France
Country of Input or Organization
France
INIS RN
24054251
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BEAM INJECTION; BEAM MONITORS; BEAM POSITION; COMPUTERIZED CONTROL SYSTEMS; DESIGN; ELECTRONIC CIRCUITS; EQUIPMENT INTERFACES; SYNCHROTRONS
Descriptors DEC
ACCELERATORS; CONTROL SYSTEMS; CYCLIC ACCELERATORS; MEASURING INSTRUMENTS; MONITORS; ON-LINE CONTROL SYSTEMS; ON-LINE SYSTEMS

Optional Information