Published August 20, 1980 | Version v1
Report Open

Inspection of irradiated P-7 fuel tubes

Description

Mark 16 U-A1 alloy production fuel tubes and six special U3O8-A1 powder metallurgy (PM) test assemblies were successfully irradiated in P-7 reactor charge beginning December 1976. A year after irradiation, the outer surfaces were inspected under water in P-Area basin. Inspection showed that a ''black'' oxide had formed on the bottom ∼2/3 and flaked off in some areas for both the production and PM tubes. A small cladding defect was also observed on one PM outer tube near the bottom. Sections were cut from the tubes and metallographically examined in the SRL High Level Caves (HLC). This report gives results of the examinations. 8 refs., 9 figs., 1 tab

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE91007203;NTIS;INIS; US Govt. Printing Office Dep.

Files

22038158.pdf

Files (940.0 kB)

Name Size Download all
md5:bad8035f28b63524bac44e48791b3d0d
940.0 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
15 p.
Report number
DPST--80-447

Optional Information

Contract/Grant/Project number
Contract AC09-76SR00001; AC09-89SR18035