Practical approach to determining risk: a case study

Creators

  • 1. British Columbia Hydro and Power Authority, Vancouver, BC (Canada)

Description

Procedures used in a risk assessment exercise involving three older dams on the Campbell River in British Columbia, which routine inspection revealed not to meet current seismic standards, were described. The risk assessment review indicated that seismic upgrading was not warranted in the case of one of the dams, and that the annual cost of not making the improvements was tolerable. Consequently, no improvements were undertaken. Probabilistic risk assessment, the technique employed in this case, is widely used by B.C. Hydro to determine if the upgrading of dam components that do not meet current engineering standards is warranted. 12 refs., 5 figs

Additional details

Publishing Information

Publisher
Riley's Reproduction and Printing Ltd.
Imprint Place
Calgary, AB (Canada)
ISBN
0-9680811-0-X
Imprint Title
Proceedings
Imprint Pagination
356 p.
Journal Page Range
p. 76-88.

Conference

Title
Canadian dam safety conference.
Dates
Oct 1996.
Place
Niagara Falls (Canada).

INIS

Country of Publication
Canada
Country of Input or Organization
Canada
INIS RN
28025500
Subject category
S13: HYDRO ENERGY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
DAMS; FLOOD CONTROL; RISK ASSESSMENT; SAFETY

Optional Information

Secondary number(s)
CONF-9610230--.