Nuclear power plant of Fessenheim: evaluation of the seismic risk

Description

The seismic risk taken into account during the sizing of the nuclear power plant of Fessenheim seems to have been under evaluated at this time. The revaluation of the seismic risk, as proposed, until this day by EDF in order to the third ten-year visit of the power plant, planned for 2009, leads to a significant under evaluation of the risk and then is not acceptable. The present expertise details point by point the weaknesses of these revaluation. The power plant has been sized in an elastic manner that is generally strongly for the safety side. It is imperative to proceed the most quickly as possible to a deep control of the seismic resistance of the power plant of Fessenheim and then after having proceeded to a revision of the seismic risk in taking into account the actual knowledge in this field. (N.C.)

Availability note (English)

Available from INIS in electronic form

Files

40108896.pdf

Files (2.2 MB)

Name Size Download all
md5:a0c56abc08b6e9113c6fbac7295ea8fd
2.2 MB Preview Download

Additional details

Additional titles

Original title (French)
Centrale Nucleaire de Fessenheim: appreciation du risque sismique

Publishing Information

Imprint Pagination
44 p.
Report number
INIS-FR--09-1270