Published December 2008 | Version v1
Journal article

Optimalisation of national industry participation in nuclear power plant construction

Creators

  • 1. Pusat Pengembangan Energi Nuklir - BATAN, Jl. Kuningan Barat, Mampang Prapatan, Jakarta Selatan 12710 (Indonesia)

Description

A study of national industry participation based on recent data has already been conducted. The current industry data is used to estimate the optimum level of national industry participation in nuclear power plant (NPP) construction based on the prior study. The purpose of the study is to give a figure of the optimum level of national industry participation in NPP construction. The scope of the study is the NPP construction project in related to the potency of national industry to participate in the project. The methodology used in the study are literature study, web surfing for industrial data, and on-the-spot industry survey that are potential to participate in NPP construction. In addition to that, discussion with expertise of industrial practitioner was also conducted. The study concludes that (1) based on the recent national industry capability provided and compared to prior similar study, it is estimated that the level of national industry participation in the first NPP construction with the capacity of 1000 MWe PWR is about 40%. (2) to accelerate NPP technology transfer, we need to build a small size NPP. The nuclear island will be developed by BATAN in cooperation with national industry and the non-nuclear island will be developed by national industry. Universities and other academicians should be involved to support and keep the sustainability of man power availability in developing the NPP technology. (author)

Additional details

Additional titles

Original title (Indonesian)
Optimalisasi partisipasi industri nasional dalam pembangunan PLTN

Publishing Information

Journal Title
Jurnal Pengembangan Energi Nuklir
Journal Volume
10
Journal Issue
2
Journal Page Range
p. 87-96
ISSN
1410-9816

INIS

Country of Publication
Indonesia
Country of Input or Organization
Indonesia
INIS RN
46134358
Subject category
S29: ENERGY PLANNING, POLICY AND ECONOMY;
Descriptors DEI
COST ESTIMATION; ECONOMIC ANALYSIS; ELECTRICITY; INDONESIA; INDUSTRY; INTEREST RATE; NUCLEAR POWER PLANTS; PLANNING; PROGRAMMING
Descriptors DEC
ASIA; DEVELOPING COUNTRIES; ECONOMICS; ISLANDS; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS

Optional Information

Notes
10 refs.; 3 tabs.