Published December 10, 1996 | Version v1
Report Open

Water resources protection strategy: Revision 1, Attachment 4

Description

The US Department of Energy (DOE) must provide a demonstration of compliance with the final US Environmental Protection Agency (EPA) ground water protection standards for inactive mill sites pursuant to 40 CFR Part 192. This plan outlines the proposed strategy to demonstrate compliance with the ground water standards at the Maybell, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This demonstration consists of (1) the ground water protection standard, (2) a performance assessment, (3) a closure performance demonstration, and (4) a performance monitoring and corrective action program

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE97002321; NTIS; US Govt. Printing Office Dep.

Files

28042739.pdf

Files (2.0 MB)

Name Size Download all
md5:f5cdf4ba4c56bd4391dc0a0a2b81848e
2.0 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
98 p.
Report number
DOE/AL/62350--24F-REV.1-ATTACH.4