LANL Activities Supporting Electron Accelerator Production of 99Mo for NorthStar Medical Radioisotopes, LLC

Description

Summary of LANL FY12 Activities are: (1) Preparation, performance, and data analysis for the FY12 accelerator tests at ANL - (a) LANL designed and installed a closed-loop helium target cooling system at ANL for the FY12 accelerator tests, (b) Thermal test was performed on March 27, (c) 24 h production test to follow the accelerator upgrade at ANL; (2) Local target shielding design and OTR/IR recommendations - (a) Target dose rate and activation products were calculated with MCNPX, (b) 206Pb(γ,2n)204mPb vs 204gPb branching ratio unpublished, will measure using the LANL microtron, (c) OTR system nearing final configuration, (d) IR prototype system demonstrated during the recent thermal test at ANL; (3) Target housing lifetime estimation - Target housing material specifications and design to be finalized following the thermal test, lifetime not believed to be an issue; and (4) Target cooling system reliability - Long duration system characterizations will begin following the thermal test.

Additional details

Publishing Information

Imprint Pagination
44 p.
Report number
LA-UR--12-22835

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
43119412
Subject category
S42: ENGINEERING;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
ACCELERATORS; BRANCHING RATIO; CONFIGURATION; COOLING SYSTEMS; DATA ANALYSIS; DESIGN; DOSE RATES; ELECTRONS; HELIUM; LIFETIME; PERFORMANCE; PRODUCTION; RADIOISOTOPES; RECOMMENDATIONS; RELIABILITY; SHIELDING; SPECIFICATIONS; TARGETS
Descriptors DEC
DIMENSIONLESS NUMBERS; ELEMENTARY PARTICLES; ELEMENTS; ENERGY SYSTEMS; FERMIONS; FLUIDS; GASES; ISOTOPES; LEPTONS; NONMETALS; RARE GASES

Optional Information

Contract/Grant/Project number
AC52-06NA25396
Notes
doi 10.2172/1045988
Funding organization
DOE/LANL (United States)