Published December 27, 1972
| Version v1
Report
Restricted
La Crosse Boiling Water Reactor. Reactor vessel heatup rate in excess of the technical specification limit. Unplanned reactor shutdown
Description
no abstract available
Availability note (English)
MF available from INIS under the Report Number.
Files
Additional details
Publishing Information
- Imprint Pagination
- 9 p.
- Report number
- DOCKET-50409--31
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 4064582
- Subject category
- S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Descriptors DEI
- CALIBRATION; HEATING; LACBWR REACTOR; LEGAL ASPECTS; PRESSURE VESSELS; REACTOR LICENSING; REACTOR OPERATION; REACTOR SHUTDOWN; SPECIFICATIONS
- Descriptors DEC
- BWR TYPE REACTORS; CONTAINERS; ENRICHED URANIUM REACTORS; LICENSING; OPERATION; POWER REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS