Published 1991 | Version v1
Journal article

Maximum usable removal speeds for containers with spent fuel assemblies

  • 1. Safetech Engineering AB, Domkyrkoesplanaden 5B, S-722 13 Vaesteras (Sweden)
  • 2. Swedish Nuclear Power Inspectorate, Stockholm (Sweden)

Description

This paper describes an analysis of handling times and sequences of operation for transport of irradiated fuel assemblies from a BWR and a PWR. Actual operational sequences have been observed at Oskarshamn 2 (BWR). Similar data have been provided from the Ringhals 2 plant (PWR), based upon lay-out drawings, crane specifications and staff experiences at the plants. The study reveals that during ordinary handling of spent fuel casks in both PWRs and BWRS, the cask is in continuous view of surveillance cameras for several hours. In the most extreme case, when preparations before and after loading of the container are omitted or done in the transport alley out of view of the surveillance camera, the time interval the container is visible to the camera is considered to be around 10 minutes

Additional details

Publishing Information

Journal Title
Nuclear Materials Management
Journal Volume
20
Series
Nucl. Mater. Manage.
Journal Page Range
821-825
ISSN
0362-0034
CODEN
NUMMB

Conference

Title
32. Institute of Nuclear Materials Management (INMM) annual meeting.
Dates
28-31 Jul 1991.
Place
New Orleans, LA (United States).

Optional Information

Secondary number(s)
CONF-910774--.