Published September 1985 | Version v1
Report Restricted

Post-accident examination of platinum resistance thermometers installed in the TMI-2 reactor

Description

Laboratory tests conducted on one resistance thermometer and thermowell removed from TMI-2 showed that neither its calibration nor its time response was adversely affected by the accident or post-accident conditions to which it had been exposed. No Never-Seez was used in its thermowell. A broken conduit fitting allowed moisture to enter the extension cables, which affected their insulation resistance. Tests on similar thermometers installed in TMI-2 and Crystal River Unit 3 at shutdown and at full power showed that the time response of the TMI-2 thermometer met the 5-second limit required by the plant technical specifications

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A05/MF A01 as TI86001300.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
84 p.
Report number
ORNL/M--98

Optional Information

Secondary number(s)
GEND-INF--064.