Post-accident examination of platinum resistance thermometers installed in the TMI-2 reactor
Description
Laboratory tests conducted on one resistance thermometer and thermowell removed from TMI-2 showed that neither its calibration nor its time response was adversely affected by the accident or post-accident conditions to which it had been exposed. No Never-Seez was used in its thermowell. A broken conduit fitting allowed moisture to enter the extension cables, which affected their insulation resistance. Tests on similar thermometers installed in TMI-2 and Crystal River Unit 3 at shutdown and at full power showed that the time response of the TMI-2 thermometer met the 5-second limit required by the plant technical specifications
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS, PC A05/MF A01 as TI86001300.
Files
Additional details
Publishing Information
- Imprint Pagination
- 84 p.
- Report number
- ORNL/M--98
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 17028458
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- CALIBRATION; INSPECTION; REACTOR ACCIDENTS; TESTING; THERMOMETERS; THREE MILE ISLAND-2 REACTOR
- Descriptors DEC
- ACCIDENTS; ENRICHED URANIUM REACTORS; MEASURING INSTRUMENTS; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Secondary number(s)
- GEND-INF--064.