Published July 1982 | Version v1
Report Restricted

HTGR steam-cycle/cogeneration lead plant design and cost report. Volume II. Nuclear Steam Supply System

Description

This document is Volume II of the three-volume HTGR-SC/C Design and Cost Report, which is, in turn, a part of the Lead Plant Project Decision Package. Itprovides a design description and estimated cost of the nuclear steam supply system (NSSS) for the 2240-MW(t) high-temperature gas-cooled reactor steam cycle/cogeneration (HTGR-SC/C plant. The NSSS is designed to supply high-temperature, high-pressure steam for cogeneration of electric power and process plant usage. It encompasses the reactor heat source, the primary and auxil;iary heat removal systems, the steam generation portion of the secondary coolant system, and related controls, instrumentation, and support equipment

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A14/MF A01; 1 as DE83008100.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
308 p.
Report number
GA/PC--000040