Published 1979 | Version v1
Report Restricted

Annual report AB 5: Material investigations in the HHT project. Status: 12/1978. Reporting period: 01.01.78-31.12.78

Description

Automatic translation: Creep tests on HGK materials (LBS no. 5.1.1-21): One possible implementation of the hot gas duct insulation is seen in a construction in which ceramic fiber mats are covered by so-called cover plates. These cover plates are attached via centrally arranged bolts attached to the outer gas duct. Cover plates and Fastening bolts are subject to the restoring forces the fiber mats as well as the necessary pretensioning of the screw connection of a creep load. In addition, a not negligible alternating stress as a result of high gas flow rate. The use of the component is planned for the lifetime of the reactor.

Abstract (German)

Zeitstandversuche an HGK-Werkstoffen (LBS-Nr. 5.1.1-21): Eine mögliche Ausführung der Heißgaskanalisolierung wird in einer Konstruktion gesehen, bei der keramische Fasermatten durch sogenannte cover plates abgedeckt werden. Diese cover plates werden über zentral angeordnete Bolzen am äußeren Gasführungsmantel befestigt. Cover plates und Befestigungsbolzen unterliegen in Folge der Rückstellkräfte der Fasermatten sowie der notwendigen Vorspannung der Schraubverbindung einer Zeitstandbelastung. Zusätzlich tritt eine nicht vernachlässigbare Wechselbeanspruchung in Folge der hohen Gasströmungsgeschwindigkeit auf. Der Einsatz der Komponente ist für die Reaktorlebensdauer geplant.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Additional titles

Original title (German)
Jahresabschlußbericht AB 5: Werkstoffuntersuchungen im HHT-Projekt. Stand: 12/1978. Berichtszeitraum: 01.01.78-31.12.78

Publishing Information

Imprint Pagination
30 p.
Report number
HRB-NJ--0012

Optional Information

Notes
Document from Juelich Preservation Project; 2 figs., 5 tabs.