Published 1990 | Version v1
Report

Waste management evaluation for PWR full system decontamination

  • 1. Westinghouse Electric Corp., Pittsburgh, PA (USA)
  • 2. LN Technologies Corp., Columbia, SC (USA)

Description

A waste management evaluation has been performed for decontamination of an entire PWR primary circuit. A 5-step AP-CanDerem decontamination will generate 86 m3 (3050 ft3) of ion exchange resin waste. Cement solidification and resin dewatering have been used for decontamination waste disposal. The total waste processing and burial cost for solidification is at least twice as expensive as for dewatering. A combination of resin incineration, resin oxidation, and dewatering yield the most practical volume reduction

Additional details

Publishing Information

Imprint Title
Waste management '90: Working towards a cleaner environment: Waste processing, transportation, storage and disposal, technical programs and public education. Volume 2, HLW and LLW technology: Proceedings
Imprint Pagination
988 p.
Journal Page Range
p. 457-462.
Report number
CONF-900210--Vol.2

Conference

Title
working towards a cleaner environment: waste processing, transportation, storage and disposal, technical programs and public education.
Acronym
Waste management '90
Dates
25 Feb - 1 Mar 1990.
Place
Tucson, AZ (USA).