Published February 1, 1995 | Version v1
Report Open

Functions and requirements for tank farm restoration and safe operations, Project W-314. Revision 3

Description

This Functions and Requirements document (FRD) establishes the basic performance criteria for Project W-314, in accordance with the guidance outlined in the letter from R.W. Brown, RL, to President, WHC, ''Tank Waste Remediation System (TWRS) Project Documentation Methodology,'' 94-PRJ-018, dated 3/18/94. The FRD replaces the Functional Design Criteria (FDC) as the project technical baseline documentation. Project W-314 will improve the reliability of safety related systems, minimize onsite health and safety hazards, and support waste retrieval and disposal activities by restoring and/or upgrading existing Tank Farm facilities and systems. The scope of Project W-314 encompasses the necessary restoration upgrades of the Tank Farms' instrumentation, ventilation, electrical distribution, and waste transfer systems

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95006790; NTIS; US Govt. Printing Office Dep.

Files

26045510.pdf

Files (3.3 MB)

Name Size Download all
md5:f62d58ab151eeca3834bb70b76303994
3.3 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
283 p.
Report number
WHC-SD--W314-FRD-001

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).