Decommissioning of the LURE Nuclear Facility

  • 1. CNRS/Unite de Demantelement de l'INB 106 - LURE, Centre Universitaire Paris Sud, Batiment 201 porte 1, 91898 Orsay Cedex (France)
  • 2. Laboratoire de Chimie Physique, Centre Universitaire Paris Sud, Batiment 349, 91898 Orsay Cedex (France)

Description

With the goal of obtaining the decommissioning of the LURE nuclear facility, three of its accelerators were dismantled and another was modified to be below the thresh- old of 'Installation Nucleaire de Base' status. Operations were carried out with the strategy of mechanical dismantling with no cutting process. As the civil engineering radioactivity level was low, a great majority of it has been left in place with no process- ing, but compensatory measures have been taken for public and environmental protection. The overall result of these operations is a gain in both cost and operating time. They also contribute to a significant decrease in the risks, including radiological ones. The radiological impact after decommissioning remains acceptable. (authors)

Availability note (English)

Available from doi: http://dx.doi.org/10.1051/radiopro/2013076

Additional details

Additional titles

Original title (French)
Demantelement de l'installation nucleaire de base 106 (LURE)

Identifiers

Publishing Information

Journal Title
Radioprotection
Journal Volume
48
Journal Issue
no.4
Journal Page Range
p. 545-561
ISSN
0033-8451
CODEN
RAPRBA

Optional Information

Notes
18 refs.