Published February 1988 | Version v1
Report Restricted

An introduction to technical issues important to geologic repository preclosure safety

Description

Preclosure safety assessment for construction, operation, caretaking, and decommissioning is required by the US Nuclear Regulatory Commission (NC) regulations as part of a license application for nuclear waste repositories. This paper will present a variety of design and safety analysis issues addressed as part of the preclosure safety analysis of nuclear waste repositories. The definition of the issues and suggested approaches to resolving the issues will be presented. These technical issues arose during the process of defining site-specific issue resolution strategies related to design and preclosure safety (Key Issue 2) in the Office of Geologic Repositories Issues Hierarchy. These issue resolution strategies are described in the Basalt Waste Isolation Project (BWIP) Site Characterization Plan. Participation in the US Department of Energy (DOE) Preclosure Risk Assessment Methodology (PRAM) Working Group has also helped to define the open technical issues. 9 refs

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A02/MF A01; 1 as DE88013581.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
10 p.
Report number
WHC-SA--0102

Conference

Title
Waste management '88.
Dates
1 Mar 1988.
Place
Tucson, AZ (USA).

Optional Information

Notes
Portions of this document are illegible in microfiche products.
Secondary number(s)
CONF-880354--9.