Structural integrity analysis of the 224U elevator mothballing

Description

As part of the preparation of Building 224U for turnover to Decontamination and Decommissioning, it is necessary to place the elevator in a mothballed condition so that it can be reactivated for use after 10 to 25 years. This mothballing is going to be accomplished by landing the counterweight on wooden timbers and suspending the elevator cab with wire rope or chain slings. This will take the load off the cables and make it relatively easy to reactive. The objective of this Supporting Document is to verify the structural integrity of all of the load bearing components involved in mothballing the 224U Building elevator. Building 224U is part of the UO3 Plant where uranyl nitrates from the PUREX Plant was converted to UO3 powder

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95003998; NTIS; US Govt. Printing Office Dep.

Files

26033692.pdf

Files (542.4 kB)

Name Size Download all
md5:0e6635608983cb4f22bba9954955156b
542.4 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
11 p.
Report number
WHC-SD--WM-DA-177

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).