Published April 1982
| Version v1
Journal article
Dose rates from the inducted activity in the ETF neutral beam injector
- 1. Oak Ridge National Laboratory, Oak Ridge, TN 37830
Description
The dose equivalent rates outside the Engineering Test Facility neutral beam injector shield from the induced radioactivity have been calculated for the reactor operating at 1140 MW for 1, 30, and 365 days. The dose rates at one day after shutdown are large even after one day of operation. Depending on the location and operating time, cooling times from 30 days to about 5 years are required before the dose rates are sufficiently low to allow routine maintenance work in the vicinity of the NBI shield
Additional details
Publishing Information
- Journal Title
- J. Fusion Energy
- Journal Volume
- 2
- Journal Issue
- 2
- Series
- J. Fusion Energy.
- Journal Page Range
- 173-178
- ISSN
- 0164-0313
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 15023413
- Subject category
- S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
- Descriptors DEI
- ALGORITHMS; DOSE EQUIVALENTS; ETF TOKAMAK; FUEL COOLING TIME; MAINTENANCE; NEUTRAL ATOM BEAM INJECTION; NEUTRAL BEAM SOURCES; RADIATION DOSES; RADIOACTIVITY; REACTOR SHUTDOWN; SHIELDS
- Descriptors DEC
- BEAM INJECTION; CLOSED PLASMA DEVICES; SHUTDOWN; THERMONUCLEAR DEVICES; TOKAMAK DEVICES