Published 2012 | Version v1
Miscellaneous Open

A mathematical model of wind park with permanent magnet synchronous generators

  • 1. Technical University, Sofia (Bulgaria)

Description

High power wing parks integration to power systems requires solving the problems with building the intersystem tie lines, power quality, power scheduling and reserve, voltage disturbance and faults. A mathematical model for investigation of the connection of a wind park with permanent magnet synchronous generator to the grid is proposed. The different static and transient modes of operation of the wind park are investigated.

Files

50008684.pdf

Files (203.6 kB)

Name Size Download all
md5:c0299f7a17f986c6b6ff2e88a9123430
203.6 kB Preview Download

Additional details

Additional titles

Original title (Bulgarian)
Математически модел на ветропарк със синхронни генератори с постоянни магнити

Publishing Information

Imprint Pagination
10 p.
Report number
INIS-BG--2660

Conference

Title
Energy Forum'2012
Dates
15-19 Jun 2012
Place
Varna (Bulgaria)

INIS

Country of Publication
Bulgaria
Country of Input or Organization
Bulgaria
INIS RN
50008684
Subject category
S71: CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSICS; S17: WIND ENERGY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
DISTURBANCES; ELECTRIC POTENTIAL; MATHEMATICAL MODELS; PERMANENT MAGNETS; POWER SYSTEMS; TRANSIENTS; WIND
Descriptors DEC
ENERGY SYSTEMS; EQUIPMENT; MAGNETS