Published November 7, 1994
| Version v1
Report
Open
Work plan for integrated sludge packaging demonstration
Description
This document describes the tasks which will be performed to support the hot demonstration of the integrated sludge packaging system to package the sludge that has accumulated in the KE Basin. This activity will be performed in three phases: Phase 1 will consist of testing component and sub-system performance using a surrogate sludge, Phase 2 will consist of cold testing the integrated sludge packaging system using a surrogate sludge, and Phase 3 will consist of the hot demonstration of the integrated sludge packaging system
Availability note (English)
MF available from INIS under the Report Number; Also available from OSTI as DE95003776; NTIS; US Govt. Printing Office Dep.Files
26033293.pdf
Files
(434.4 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:346fda6d65e8b25b7f046768f21b658d
|
434.4 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 7 p.
- Report number
- WHC-SD--SNF-WP-010
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 26033293
- Subject category
- S42: ENGINEERING;
- Descriptors DEI
- CLEANING; CONTAINERS; CYCLONE SEPARATORS; FILTERS; FUEL STORAGE POOLS; HANFORD RESERVATION; MATERIALS HANDLING EQUIPMENT; PACKAGING; PERFORMANCE TESTING; PUMPS; SIMULATION; SLUDGES; WEIGHT INDICATORS
- Descriptors DEC
- CONCENTRATORS; EQUIPMENT; INERTIAL SEPARATORS; MEASURING INSTRUMENTS; NATIONAL ORGANIZATIONS; SEPARATION EQUIPMENT; TESTING; US DOE; US ORGANIZATIONS
Optional Information
- Contract/Grant/Project number
- Contract AC06-87RL10930
- Funding organization
- USDOE, Washington, DC (United States).