Published November 7, 1994 | Version v1
Report Open

Work plan for integrated sludge packaging demonstration

Description

This document describes the tasks which will be performed to support the hot demonstration of the integrated sludge packaging system to package the sludge that has accumulated in the KE Basin. This activity will be performed in three phases: Phase 1 will consist of testing component and sub-system performance using a surrogate sludge, Phase 2 will consist of cold testing the integrated sludge packaging system using a surrogate sludge, and Phase 3 will consist of the hot demonstration of the integrated sludge packaging system

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95003776; NTIS; US Govt. Printing Office Dep.

Files

26033293.pdf

Files (434.4 kB)

Name Size Download all
md5:346fda6d65e8b25b7f046768f21b658d
434.4 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
7 p.
Report number
WHC-SD--SNF-WP-010

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).