Examination of disks from the IPNS depleted uranium target
Description
This report describes the results of examining the Zircaloy-2 clad depleted uranium disks from the Intense Pulse Neutron Source (IPNS) Target. That target operated from August, 1981 to June, 1988 and from September, 1991 to September, 1992 at 450 MeV, pulsing at 30 Hz with a time average proton current of about 15 microA. The target was removed from service when the presence of fission products (135Xe) in the coolant cover gas indicated a failure in the Zircaloy-2 cladding. Altogether, the target had absorbed about 240 mA hours of proton current, and endured between 50,000 and 100,000 thermal cycles. The purpose of the examination was to assess the condition of the disks and determine the cause of the cladding failure. The results of visual, gamma ray scanning, and destructive metallurgical examination of two disks are described
Availability note (English)
MF available from INIS under the Report Number; Also available from OSTI as DE96004774; NTIS; US Govt. Printing Office Dep.Files
27044940.pdf
Files
(465.4 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:b3f18070e314b61abc0712e37516ab61
|
465.4 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 11 p.
- Report number
- ANL--ET/CP-88825
Conference
- Title
- international collaboration on advanced neutron sources.
- Acronym
- ICANS-XIII
- Dates
- 11-14 Oct 1995.
- Place
- Villigen (Switzerland).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 27044940
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Numerical Data
- Descriptors DEI
- DEPLETED URANIUM; EXPERIMENTAL DATA; FAILURES; FUEL CANS; IPNS-I SYNCHROTRON; NEUTRON SOURCES; PHYSICAL RADIATION EFFECTS; POST-IRRADIATION EXAMINATION; TARGETS; ZIRCALOY 2
- Descriptors DEC
- ACCELERATORS; ACTINIDES; ALLOY-ZR98SN-2; ALLOYS; CHROMIUM ADDITIONS; CORROSION RESISTANT ALLOYS; CYCLIC ACCELERATORS; DATA; ELEMENTS; HEAT RESISTANT MATERIALS; HEAT RESISTING ALLOYS; INFORMATION; IRON ADDITIONS; MATERIALS; METALS; NICKEL ADDITIONS; NUMERICAL DATA; PARTICLE SOURCES; RADIATION EFFECTS; RADIATION SOURCES; SYNCHROTRONS; TIN ALLOYS; TRANSITION ELEMENT ALLOYS; URANIUM; ZIRCALOY; ZIRCONIUM ALLOYS; ZIRCONIUM BASE ALLOYS
Optional Information
- Contract/Grant/Project number
- Contract W-31109-ENG-38
- Funding organization
- USDOE, Washington, DC (United States).
- Secondary number(s)
- CONF-9510212--17.