Published December 1980 | Version v1
Journal article

Concrete slump in nuclear power plant construction

  • 1. State Univ, University Park

Description

The various aspects related to the slump test are detailed for nine nuclear power plants including test frequency, acceptance criteria, time limits, and the addition of supplement water. These aspects are compared to industry standards of practice. It is pointed out that nuclear concrete specifications are written so as to diminish the role played by the concrete inspector because much of the engineering judgment traditionally applied on commercial construction projects is not permitted on nuclear construction. Instead, the rigid interpretation of the specifications often relegates the inspector to a position of nothing more than a number collector. It is suggested that the role of the inspector is the most important element in a cost effective quality control program and should be complemented with flexible specifications that include inadvertency margins are void of time limits, lower slump limits, and running averages. 15 refs

Additional details

Publishing Information

Journal Title
J. Constr. Div., Proc. ASCE
Journal Volume
106
Journal Issue
4
Series
J. Constr. Div., Proc. ASCE.
Journal Page Range
567-584

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
12608238
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Descriptors DEI
CONCRETES; CONSTRUCTION; MATERIALS TESTING; NUCLEAR POWER PLANTS; QUALITY CONTROL; SPECIFICATIONS
Descriptors DEC
BUILDING MATERIALS; CONTROL; NUCLEAR FACILITIES; POWER PLANTS; TESTING; THERMAL POWER PLANTS