Published 1982
| Version v1
Report
Restricted
Schedule planning for construction projects
Description
Operating contractors of government-owned facilities manage construction projects having a maximum value of $1,000,000. Successful execution is dependent upon pragmatic scheduling. Such scheduling requires that all activities (both engineering and non-engineering) be integrated into a compatible sequence of events with adequate time allowed for each event. To develop realistic schedules, project event standards and program measures of performance have been established
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS, PC A02/MF A01; 1 as DE85004048.
Files
Additional details
Publishing Information
- Imprint Pagination
- 4 p.
- Report number
- K/D--5313
Conference
- Title
- 26. American Association of Cost Engineers annual meeting.
- Dates
- 27-30 Jun 1982.
- Place
- Houston, TX (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 16062002
- Subject category
- S99: GENERAL AND MISCELLANEOUS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CONSTRUCTION; MANAGEMENT; PLANNING; TENNESSEE; US DOE
- Descriptors DEC
- DEVELOPED COUNTRIES; NATIONAL ORGANIZATIONS; NORTH AMERICA; US ORGANIZATIONS; USA
Optional Information
- Secondary number(s)
- CONF-820615--3.