THTR-Project: Report on the Experiment J.P. 3 Work Performed in the Hotlabor Wuerenlingen

Description

Automatic translation: Like the previous work for the THTR project also fell this within the framework of the contract dated August 19, 1965 between KEA Jülich and the EIR Würenlingen. The details of the investigations were provided by the THTR project liaison, Dr. groos, specified, during the first three weeks personally to the work participated. Work began on June 6, 1966 and was completed in early October. Overall, no major difficulties were encountered and collaboration with the THTR project continued to be excellent.

Abstract (German)

Wie die vorangegangenen Arbeiten für das THTR-Projekt fielen auch diese in den Rahmen des Vertrages vom 19.8.1965 zwischen der KEA Jülich und dem EIR Würenlingen. Die Einzelheiten der Untersuchungen wurden vom Verbindungsmann des THTR-Projektes, Herrn Dr. Groos, festgelegt, der während der ersten drei Wochen persönlich an den Arbeiten teilnahm. Die Arbeiten begannen am 6.6.1966 und waren anfangs Oktober abgeschlossen. Insgesamt traten keine grössere Schwierigkeiten auf und die Zusammenarbeit mit dem THTR-Projekt war weiterhin ausgezeichnet.

Files

53049655.pdf

Files (7.3 MB)

Name Size Download all
md5:86ec4cd1b419228335e65c964332fb4c
7.3 MB Preview Download

Additional details

Additional titles

Original title (German)
THTR-Projekt: Bericht ueber die am Experiment J.P. 3 im Hotlabor Wuerenlingen durchgefuehrten Arbeiten

Publishing Information

Imprint Pagination
60 p.
Report number
THTR-AN--669/2.02

Optional Information

Notes
Document from Juelich Preservation Project; Figs., tabs.