Published May 25, 2005 | Version v1
Report

Dual Power Supplies for PEP-II Injection Kickers

Description

Originally the PEP-II injection kickers were powered by one power supply. Since the kicker magnets where not perfectly matched, the stored beam got excited by about 7% of the maximum kicker amplitude. This led to luminosity losses which were especially obvious for trickle injection when the detector is on for data taking. Therefore two independent power supplies with thyratrons in the tunnel next to the kicker magnet were installed. This also reduces the necessary power by about a factor of four since there are no long cables that have to be charged. The kickers are now independently adjustable to eliminate any non-closure of the kicker system and therefore excitation of the stored beam. Setup, commissioning and fine tuning of this system are discussed

Availability note (English)

Available from http://www.slac.stanford.edu/cgi-wrap/getdoc/slac-pub-11232.pdf; http://www.slac.stanford.edu/cgi-wrap/pubpage?slac-pub-11232.html; PURL: https://www.osti.gov/servlets/purl/890813-vorlwo/

Additional details

Publishing Information

Imprint Pagination
3 p.
Report number
SLAC-PUB--11232

Conference

Title
Particle Accelerator Conference (PAC 05)
Dates
16-20 May 2005
Place
Knoxville, TN (United States)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
38003135
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ACCELERATORS; AVAILABILITY; CABLES; COMMISSIONING; EXCITATION; KICKER MAGNETS; LUMINOSITY; POWER SUPPLIES; THYRATRONS; TUNING
Descriptors DEC
ELECTRON TUBES; ELECTRONIC EQUIPMENT; ENERGY-LEVEL TRANSITIONS; EQUIPMENT; GAS DISCHARGE TUBES; MAGNETS; OPTICAL PROPERTIES; PHYSICAL PROPERTIES

Optional Information

Contract/Grant/Project number
AC02-76SF00515
Funding organization
US Department of Energy (United States)