Governments deciding to use nuclear energy as part of their country's energy mix are faced with long-term planning efforts and huge investments. As nuclear power plants constitute one of the socially and politically most contested technologies, the question arises, which time horizons companies as well as politicians have to consider for the accomplishment and grid-connection of individual and whole fleets of reactors. Unfortunately, there are no large-N studies investigating the time for completion of such large-scale projects. For the first time, we statistically explain the duration of the construction of all initiated nuclear plant projects so far. Based on the International Atomic Energy's comprehensive Power Reactor Information System (PRIS) we assess the impact of demographic, economic, and political preconditions of a country, at the same time accounting for different types of reactor technologies. To account for non-linear relationships, we apply non-parametric survival models with P-splines. A main result of our analysis is that time of connection to grid increases over the years indicating increased societal sensibilities, respect for higher security standards, and increased project complexities. The Harrisburg and the Chernobyl disaster did not induce a separate additional delaying effect. - Highlights: • Consideration of all commercial nuclear power plants ever built worldwide. • Statistical analysis of the construction duration of nuclear power plants. • Identification of economic, societal, and technological factors delaying connection to the grid. • Application of advanced statistical techniques
Availability note (English)
Available from http://dx.doi.org/10.1016/j.enpol.2014.03.015Additional details
Identifiers
- DOI
- 10.1016/j.enpol.2014.03.015;
- PII
- S0301-4215(14)00162-1;
Publishing Information
- Journal Title
- Energy Policy
- Journal Volume
- 70
- Journal Page Range
- p. 163-171
- ISSN
- 0301-4215
- CODEN
- ENPYAC
INIS
- Country of Publication
- United Kingdom
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 46064298
- Subject category
- S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Descriptors DEI
- CONSTRUCTION; IAEA; INFORMATION SYSTEMS; INVESTMENT; NUCLEAR POWER PLANTS; PLANNING; POWER REACTORS; REACTOR ACCIDENTS; REACTOR TECHNOLOGY; SAFETY STANDARDS
- Descriptors DEC
- ACCIDENTS; INTERNATIONAL ORGANIZATIONS; NUCLEAR FACILITIES; POWER PLANTS; REACTORS; STANDARDS; THERMAL POWER PLANTS
Optional Information
- Copyright
- Copyright (c) 2014 Elsevier Science B.V., Amsterdam, The Netherlands, All rights reserved.