Fast generation shedding equipment based on the observation of swings of generators

  • 1. Tokyo Electric Power Co., Tokyo (Japan)

Description

This paper presents a new method and newly developed stabilizing equipment to prevent the loss of synchronism of generators in pumped-storage plants from spreading. The proposed method includes functions to estimate the swing of each generator by using on-line generator output sampled at a rate of 600 times per second after an occurrence of disturbance such as fault, faulty equipment and so on, to predict generator swing 200-300 milliseconds ahead and loss of synchronism between generators in pumped-storage plants and those in thermal and nuclear plants, and to decide the number of generators that must be shed to maintain stability. Tokyo Electric Power Co. (TEPCO) installed the newly developed stabilizing equipment based on this method in the power system in June, 1986

Additional details

Publishing Information

Journal Title
IEEE Transactions on Power Systems
Journal Volume
3
Journal Issue
2
Series
IEEE Trans. Power Syst.
Journal Page Range
439-446
ISSN
0885-8950
CODEN
ITPSE