Operating results obtained in a nuclear power plant with a sensor surveillance prototype
Creators
- 1. EDF/DER, Chatou (France)
- 2. CEN/Saclay (France)
- 3. FRAMATOME, Paris-la-Defense (France)
- 4. Westinghouse, Pittsburg (USA)
Description
Surveillance methods have been validated and specific equipment have been built to measure the response time of sensors from a nuclear power plant protection channel. The reason of the choice of this parameter is twofold: the sensor response time is representative of the sensor physical status and is also part of the overall channel response time. Two surveillance methods are used: noise analysis (by AR or PSD modeling), and loop current step response (for resistance thermometer detectors only). The methods were validated on test facilities and on nuclear power plants. Two test equipments were built and tested on plants. Results are represented and conclusions are drawn on the feasibility of such methods for sensor surveillance
Availability note (English)
MF available from INIS under the Report Number.Abstract (French)
Des methodes de surveillance ont ete validees et un equipement specialise a ete realise pour mesurer en ligne le temps de reponse de capteurs appartenant a une chaine de protection de reacteur nucleaire. La raison du choix de ce parametre est double: le temps de reponse du capteur est representatif de l'etat physique du capteur et contribue au temps de response global de la chaine de protection, dont la verification periodique est a faire. Deux methodes de surveillance sont utilisees: l'analyse de bruit (part modele autoregressif ou par lissage de fonction de transfert) et le test de boucle de courant (pour les capteurs a resistance thermometrique seulement). Les methodes ont ete validees sur des boucles d'essais et sur des centrales nucleaires. Deux equipements de test on ete construits et testes en centrale. Les resultats obtenus sont presentes. Des conclusions sont tirees sur la possibilite d'utiliser de telles methodes pour la surveillance en ligne des capteursFiles
15003019.pdf
Files
(451.6 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:d835c801448dc69a429c31dafd387b11
|
451.6 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 19 p.
- Report number
- CEA-CONF--6717
Conference
- Title
- 5. Symposium on power plant dynamics, control and testing.
- Dates
- 21-23 Mar 1983.
- Place
- Knoxville, TN (USA).
INIS
- Country of Publication
- France
- Country of Input or Organization
- France
- INIS RN
- 15003019
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- DETECTION; FEASIBILITY STUDIES; FLUCTUATIONS; INSPECTION; MEASURING INSTRUMENTS; NUCLEAR POWER PLANTS; PERFORMANCE TESTING; PRESSURE MEASUREMENT; REACTOR CONTROL SYSTEMS; REACTOR PROTECTION SYSTEMS; RELIABILITY; RESPONSE FUNCTIONS; TEMPERATURE MEASUREMENT
- Descriptors DEC
- CONTROL SYSTEMS; FUNCTIONS; NUCLEAR FACILITIES; POWER PLANTS; TESTING; THERMAL POWER PLANTS; VARIATIONS