Published April 4, 1995 | Version v1
Report Open

Core sampling system spare parts assessment

Description

Soon, there will be 4 independent core sampling systems obtaining samples from the underground tanks. It is desirable that these systems be available for sampling during the next 2 years. This assessment was prepared to evaluate the adequacy of the spare parts identified for the core sampling system and to provide recommendations that may remediate overages or inadequacies of spare parts

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95010135; NTIS; US Govt. Printing Office Dep.

Files

26060612.pdf

Files (3.2 MB)

Name Size Download all
md5:aea092029b70cec252d4080e470e8426
3.2 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
45 p.
Report number
WHC-SD--WM-ER-431

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).