Published 2001 | Version v1
Miscellaneous Open

New phenomena observed during fuel assemblies testing

Creators

  • 1. Kozloduy NPP, Kozloduy (Bulgaria)

Description

The paper presents a new attempt to explain inexplicable increase of specific activity for some of the fuel assemblies during the fuel tightness testing procedures on Kozloduy NPP. A brief description of established procedure for fuel tightness control is presented in the paper. Special emphasis is given on a hypothesis that explains the fact of existence of deviation in Iodine activity more than usual, which have no reasonable interpretation. The reasons for uniform high Iodine activity for reloaded assemblies, that have kept in the open measuring can for a long time (1-3 hours), is found to be the process of Iodine dissolving in the water and the accelerated process of natural degassing. A proposal to use the 134Cs and 137Cs as stand-alone criteria for more precise results is made in respect to increase the reliability of fuel reloading and storage procedures

Availability note (English)

Available from INIS in electronic form

Files

33070714.pdf

Files (88.1 kB)

Name Size Download all
md5:662ddb5d791ec920c7ad9878ece6d529
88.1 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
2 p.
Report number
INIS-BG--0464

Conference

Title
International conference on WWER fuel performance, modelling and experimental support
Dates
1-5 Oct 2001
Place
Varna (Bulgaria)