Published August 4, 1998 | Version v1
Report Open

Tank farms essential drawing plan

Description

The purpose of this document is to define criteria for selecting Essential Drawings, Support Drawings, and Controlled Print File (CPF) drawings and documents for facilities that are part of East and West Tank Farms. Also, the drawings and documents that meet the criteria are compiled separate listings. The Essential Drawing list and the Support Drawing list establish a priority for updating technical baseline drawings. The CPF drawings, denoted by an asterisk (*), defined the drawings and documents that Operations is required to maintain per the TWRS Administration Manual. The Routing Boards in Buildings 272-WA and 272-AW are not part of the CPF

Availability note (English)

Available from INIS in electronic form; ALSO AVAILABLE FROM OSTI AS DE99050979; NTIS; US GOVT. PRINTING OFFICE DEP.

Files

30054379.pdf

Files (744.7 kB)

Name Size Download all
md5:46dd60d4c2d772b9220ec592db38f756
744.7 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
70 p.
Report number
HNF-SD-WM-PC--002-Rev.11