France: Ongoing Dialogue with the Safety Authority. Appendix V
Creators
Description
In France, nuclear power licensing is based on the following: – An initial design life of 40 years; – No time limit for NPP operation; – As the plant ages, the safety authority conducts an extensive safety review (PSR) every ten years to ensure that the plant continues to be in conformity with the original safety standards and with any additional requirements; – Improvements required as a result of the PSR process, of updates to the safety standards, of operating feedback and of lessons learned, must be implemented. Électricité de France (EDF) has proposed solutions to meet the safety standards and is responsible for implementing them as agreed and approved by the safety authority. The latter is responsible for issuing the authorization to continue operation for ten more years, assuming that the outcome of the PSR is satisfactory and the safety analysis report meets the current licensing requirements
Additional details
Identifiers
Publishing Information
- Publisher
- IAEA
- Imprint Place
- Vienna (International Atomic Energy Agency (IAEA))
- ISBN
- 978-92-0-104218-7
- Imprint Title
- Economic Assessment of the Long Term Operation of Nuclear Power Plants: Approaches and Experience
- Imprint Pagination
- 144 p.
- Journal Issue
- no. NP-T-3.25
- Series
- IAEA Nuclear Energy Series
- Journal Page Range
- p. 104-105
- ISSN
- 1995-7807
INIS
- Country of Publication
- International Atomic Energy Agency (IAEA)
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 50006514
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- REACTOR DESIGN; REACTOR LICENSING; REACTOR OPERATION; SAFETY ANALYSIS; SAFETY REPORTS; SAFETY STANDARDS
- Descriptors DEC
- DESIGN; LICENSING; OPERATION; REACTOR LIFE CYCLE; STANDARDS
Optional Information
- Secondary number(s)
- STI/PUB--1813