Published December 1965 | Version v1
Miscellaneous Open

Revised action plan of the Maintenance division for 1965, Annex 4

Creators

  • 1. Reaktor RA, Odelenje odrzavanja, Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia)

Description

The action plan presented in this annex is a revised version of the plan adopted in January 1965. It includes tasks of the mechanics, electrical and electronic equipment services. It includes a detailed list of planned and preventive maintenance actions related to the heavy water system, technical water system, helium system, reactor core, transportation equipment, hot cells, heating and ventilation systems in the reactor building, power supply system, auxiliary systems in the RA reactor building

Abstract (Serbian)

Plan zadataka prikazan u ovom prilogu je revidiran u donosu na plan usvojen u januaru 1965. On obuhvata aktivnosti masinske, elektro grupe i grupe za elektroniku na preventivnom odrzavanju i planskom remontu sistema teske vode, sistema tehnicke vode, sistema helijuma, centralnog tela reaktora, sistema grejanja i ventilacije, sistema za snabdevanje elektricnom energijom, i ostalih pomocnih sistema u zgradi reaktora RA

Files

41124149.pdf

Files (299.1 kB)

Name Size Download all
md5:628b1ceeefaef2c904e69b23c093171e
299.1 kB Preview Download
Part of:
Annual report of the maintenance division for 1965

Additional details

Additional titles

Original title (Serbian)
Prilog br. 4 - Revidirani plan zadataka Odelenja odrzavanja u 1965. godini

Publishing Information

Imprint Place
Beograd-Vinca (Serbia)
Imprint Title
Annual report of the maintenance division for 1965
Imprint Pagination
236 p.
Journal Page Range
5 p.
Report number
INIS-CS--0065

Optional Information

Notes
4 tabs; This record replaces 37118468 Imprint:17 tabs, 13 figs, 5 refs;Godisnji izvestaj Odelenja odrzavanja za 1965. g.
Secondary number(s)
RA--214/R3/P3/58/04